1. CN110629677 - Method for erecting segmental steel girder on pier top short slideway girder

Office China
Application Number 201910934860.5
Application Date 29.09.2019
Publication Number 110629677
Publication Date 31.12.2019
Grant Number 110629677
Grant Date 26.01.2021
Publication Kind B
IPC
E01D 21/00
EFIXED CONSTRUCTIONS
01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
DBRIDGES
21Methods or apparatus specially adapted for erecting or assembling bridges
CPC
E01D 21/00
EFIXED CONSTRUCTIONS
01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
DCONSTRUCTION OF BRIDGES, ; ELEVATED ROADWAYS; OR VIADUCTS; ASSEMBLY OF BRIDGES
21Methods or apparatus specially adapted for erecting or assembling bridges
Applicants CHINA RAILWAY MAJOR BRIDGE ENGINEERING GROUP CO., LTD.
中铁大桥局集团有限公司
Inventors CHEN TAO
陈涛
LUO BING
罗兵
CUI YIBING
崔一兵
ZHA DAOHONG
查道宏
LI JUNTANG
李军堂
SONG YULIANG
宋宇亮
ZHANG WENBIN
张文斌
YANG HAO
杨浩
JIANG JIANGHUA
姜江华
JIA WEIJUN
贾维君
YAO SEN
姚森
HU YONG
胡勇
SHU HAIHUA
舒海华
ZHANG GENG
张耿
Agents 武汉智权专利代理事务所(特殊普通合伙) 42225
Title
(EN) Method for erecting segmental steel girder on pier top short slideway girder
(ZH) 墩顶短滑道梁上架设节段钢梁的方法
Abstract
(EN)
The invention discloses a method for erecting a segmental steel girder on a pier top short slideway girder. The method comprises the following steps of: S1: arranging a bob-weight component with an adjustable weight on a first segmental steel girder; S2: enabling the first segmental steel girder to fall to a preset first position on the pier top short slideway girder; S3: hoisting a second segmental steel girder, and enabling the second segmental steel girder and the first segmental steel girder to be subjected to butt joint to form a first integral steel girder; S4: after the bob-weight component is regulated to enable the first integral steel girder to be regulated to a target bob weight, moving the first integral steel girder to preset displacement; S5: repeating the above S3-S4, carrying out butt joint on a plurality of segmental steel girders in sequence on the first integral steel girder until all butt joint segmental steel girders have an integral anti-overturning capability onthe pier top short slideway girder; and S6: erecting remaining segmental steel girders on two sides of all erected segmental steel girders. The method erects the steel girders on the pier top short slideway girder in a bot-weight and slippage way, and has a safe and reliable construction process.

(ZH)
本发明公开了一种墩顶短滑道梁上架设节段钢梁的方法,方法包括:步骤S1:在第一节段钢梁上设置重量可调的配重件;步骤S2:将第一节段钢梁落梁至墩顶短滑道梁上的预设的第一位置;步骤S3:起吊第二节段钢梁,并将第二节段钢梁与第一节段钢梁对接形成第一整体钢梁;步骤S4:调整配重件使得第一整体钢梁调节至目标配重后,再将第一整体钢梁移至预设的位移;步骤S5:重复上述步骤S3~S4,在第一整体钢梁上依次对接若干节段钢梁,直至对接后的所有节段钢梁在墩顶短滑道梁上具有整体抗倾覆能力;步骤S6:在已架的所有节段钢梁的两侧架设剩余的节段钢梁。本发明在墩顶短滑道梁上的钢梁采用配重和滑移的方式进行架梁,施工过程安全可靠。