Processing

Please wait...

Settings

Settings

Goto Application

1. WO2022094741 - METHOD AND APPARATUS FOR CONSTRUCTING MULTI-PERIOD HIGH-DIMENSIONAL PROJECTION UNIT COMMITMENT MODEL

Publication Number WO/2022/094741
Publication Date 12.05.2022
International Application No. PCT/CN2020/126049
International Filing Date 03.11.2020
IPC
G06Q 10/06 2012.1
GPHYSICS
06COMPUTING; CALCULATING OR COUNTING
QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
10Administration; Management
06Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
G06Q 50/06 2012.1
GPHYSICS
06COMPUTING; CALCULATING OR COUNTING
QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
50Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
06Electricity, gas or water supply
H02J 3/00 2006.1
HELECTRICITY
02GENERATION, CONVERSION, OR DISTRIBUTION OF ELECTRIC POWER
JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
3Circuit arrangements for ac mains or ac distribution networks
Applicants
  • 广西大学 GUANGXI UNIVERSITY [CN]/[CN]
Inventors
  • 杨林峰 YANG, Linfeng
  • 李维 LI, Wei
  • 方蓓华 FANG, Beihua
  • 陈施菲 CHEN, Shifei
Agents
  • 合肥市科融知识产权代理事务所(普通合伙) HEFEI KERONG INTELLECTUAL PROPERTY AGENCY (GENERAL PARTNERSHIP)
Priority Data
Publication Language Chinese (zh)
Filing Language Chinese (ZH)
Designated States
Title
(EN) METHOD AND APPARATUS FOR CONSTRUCTING MULTI-PERIOD HIGH-DIMENSIONAL PROJECTION UNIT COMMITMENT MODEL
(FR) PROCÉDÉ ET APPAREIL DE CONSTRUCTION DE MODÈLE D'ENGAGEMENT D'UNITÉ À PROJECTION DANS UN GRAND NOMBRE DE DIMENSIONS SUR PLUSIEURS PÉRIODES
(ZH) 一种多时段高维投影机组组合模型的构建方法和装置
Abstract
(EN) A method and apparatus for constructing a multi-period high-dimensional projection unit commitment model, which are applicable to the technical field of electric power. The method comprises: collecting basic data of an electric motor unit of an electric power system (S102); projecting, into an interval [0,1], a unit power variable and parameters, which are related thereto, by using a variable projection technique (S104); and introducing all operating states of a single unit of the electric motor unit in multiple periods, systematically deriving, on the basis of the actual operating requirements of the unit, ideal expression forms of unit output power upper bound constraint and climbing constraint in the multiple periods by using an introduced state variable, eliminating the new state variable by using relationships between the introduced new state variable and the other state variables, so as to improve the conciseness of a model, and adding other constraints and an objective function to finally obtain a multi-period unit commitment model (S106). According to the model construction method, the multi-period high-dimensional projection unit commitment model is established. The model is more compact and has relatively high computational efficiency.
(FR) L'invention concerne un procédé et un appareil pour construire un modèle d'engagement d'unité à projection dans un grand nombre de dimensions sur plusieurs périodes, qui s'appliquent au domaine technique de l'énergie électrique. Le procédé comprend les étapes suivantes : recueillir des données de base d'une unité de moteur électrique d'un système d'alimentation électrique (S102); projeter, dans un intervalle [0,1], une variable de puissance d'unité et des paramètres, qui sont associés à celle-ci, en utilisant une technique de projection de variables (S104); et introduire tous les états de fonctionnement d'une seule unité de l'unité de moteur électrique dans de multiples périodes, dériver systématiquement, en fonction des critères de fonctionnement réels de l'unité, des formes d'expression idéales de contrainte de limite supérieure et de contrainte de croissance de puissance de sortie d'unité et dans les multiples périodes en utilisant une variable d'état introduite, éliminer la nouvelle variable d'état en utilisant des relations entre la nouvelle variable d'état introduite et les autres variables d'état, de façon à améliorer la concision d'un modèle, et ajouter d'autres contraintes et une fonction objectif pour obtenir au final un modèle d'engagement d'unité sur plusieurs périodes (S106). Selon le procédé de construction de modèle, le modèle d'engagement d'unité à projection dans un grand nombre de dimensions sur plusieurs périodes est établi. Le modèle est plus compact et présente une efficacité de calcul relativement élevée.
(ZH) 一种多时段高维投影机组组合模型的构建方法和装置,适用于电力技术领域,该方法通过采集电力系统电机机组的基础数据(S102),利用变量投影技术将机组功率变量及与其相关的参数投影到区间[0,1](S104),并引入电机机组在多个时段内单个机组的所有运行状态,并基于机组的实际运行需求利用引入的状态变量系统地推导出多时段内的机组出力上界约束和爬坡约束的理想表达形式;利用引入的新状态变量与其他状态变量之间的关系消除新状态变量以提升模型的简洁性,加入其他约束和目标函数后最终得到多时段的机组组合模型(S106)。根据该建模方法,一个多时段高维投影机组组合模型被建立。该模型更紧凑,且计算效率更高。
Latest bibliographic data on file with the International Bureau